Quality Control
Traditional quality control elements are found in each project-specific Field Quality Plan, which is written in accordance with Project Execution Procedure (PEP) 315, Project Quality Control. The project-specific plan can be modified to incorporate additional customer quality requirements, up to and including NQA-1 standards. Following are typical quality control related procedures for a project:
- Quality Verification - General
- Quality Verification - Subsurface Foundations
- Quality Verification - Earthwork
- Quality Verification - Concrete
- Quality Verification - Structural and Miscellaneous Steel
- Quality Verification - Piping
- Quality Verification - Field Erected Tanks
- Quality Verification - Driven Equipment
- Quality Verification - Electrical Power and Lighting Installation
- Quality Verification - Electrical Instrumentation and Control System Installation
- Quality Verification - Architectural, Non-Process, and Miscellaneous items
- Quality Verification - Subcontracted Work
These procedures are checklist-driven. They contain requirements for testing and verification and for organizing, maintaining, and retaining resultant quality records to facilitate turnover.